Project Lists

PARTICULARS
:
Bar-bending works for 11-storey condominium & 3-storey hotel at Tanjung Tuan Resort,Port Dickson
OWNER
:
MBf Builders Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Macro Resources Sdn Bhd
STARTING DATE
:
July ' 89
COMPLETION DATE
:
April ' 90
WORK STATUS
:
Completed
PARTICULARS
:
Upgrading works at Grd Flr to Penthouse of existing 7 storey Building on Lots 139 & 140, Sec. 19, Jln Pudu, Kuala Lumpur.
OWNER
:
Panglobal Insurance Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Reka Architect S/B
STARTING DATE
:
Dec ' 90
COMPLETION DATE
:
Feb ' 91
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Tambahan Kepada Rumah Banglo 2-Tingkat sedia-ada di atas Lot 12343, Subang Jaya, Selangor
OWNER
:
Ngai Cheong Metal Industries Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Lye Tye Fong Consulting Engineer
STARTING DATE
:
Dec ' 90
COMPLETION DATE
:
Apr ' 91
WORK STATUS
:
Completed
PARTICULARS
:
Renovation works for MRI Centre at Pantai Medical Centre, Kuala Lumpur.
OWNER
:
Pantai Medical Centre
ARCHITECT/CONSULTANT/ ENGINEERS
:
Smitech (M) Sdn Bhd
STARTING DATE
:
Feb ' 91
COMPLETION DATE
:
Feb ' 91
WORK STATUS
:
Completed
PARTICULARS
:
Labour sub-contract for Proposed LPG Bottling Plant at Lot 71, Bentong, Pahang
OWNER
:
Dialog Construction Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Petronas Dagangan Sdn Bhd
STARTING DATE
:
Feb ' 91
COMPLETION DATE
:
Jul ' 91
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Membina & Menyiapkan 100 Buah Rumah Peserta Dan Kerja-kerja Berkaitan Di Felcra Gugusan Tembeling Tengah, Jerantut, Pahang
OWNER
:
Felcra, Pahang
ARCHITECT/CONSULTANT/ ENGINEERS
:
Melody Klasik Sdn Bhd
STARTING DATE
:
Aug 91'
COMPLETION DATE
:
June 92'
WORK STATUS
:
Completed
PARTICULARS
:
Renovation works for MRI Centre at Lower Ground Floor, Johor Specialist Hospital Johor Bahru.
OWNER
:
Perbadanan Kemajuan Ekonomi Negeri Johor
ARCHITECT/CONSULTANT/ ENGINEERS
:
Azhar Rouse & Hisham Sdn
STARTING DATE
:
Dec ' 91
COMPLETION DATE
:
Mar ' 92
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan satu unit kilang di atas Lot 12A, Nilai untuk Dialog Salcon Engineering Sdn Bhd
OWNER
:
Dialog Salcon Engineering Sdn Bhd (Now Dialog Bhd)
ARCHITECT/CONSULTANT/ ENGINEERS
:
Jurutera Maha Reka
STARTING DATE
:
Sept ' 91
COMPLETION DATE
:
Mar ' 92
WORK STATUS
:
Completed
PARTICULARS
:
Proposed design & renovation works for office
OWNER
:
K. Line Air Services (M) Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Kinkawa Design Associates S/B
STARTING DATE
:
Jan ' 92
COMPLETION DATE
:
Feb ' 92
WORK STATUS
:
Completed
PARTICULARS
:
Proposed execution & completion of road, drainage and all associated works on Lot 942, Mukim Krubong, Melaka
OWNER
:
MCB Southern Land Sdn Bhd / Thian Enterprise Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
-
STARTING DATE
:
March ' 92
COMPLETION DATE
:
April ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Proposed design, supply and construction of beauty salon at Wisma Nagaria.
OWNER
:
Newage Beauty Saloon
ARCHITECT/CONSULTANT/ ENGINEERS
:
Kinkawa Design Associates S/B
STARTING DATE
:
Mar ' 92
COMPLETION DATE
:
Apr ' 92
WORK STATUS
:
Completed
PARTICULARS
:
Proposed 463 units of houses, Phase 3, Taman Sri Bahagia. ~Drainage & Road Works
OWNER
:
Sunrise Developm' t Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Macro Resources S/B
STARTING DATE
:
Aug ' 92
COMPLETION DATE
:
Feb ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Proposed sewage treatment plant at Ampang Hilir for Kabra Holdings Sdn Bhd
OWNER
:
MBf Builders Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Transwater Sdn Bhd
STARTING DATE
:
June ' 92
COMPLETION DATE
:
Oct ' 92
WORK STATUS
:
Completed
PARTICULARS
:
Proposed sewage treatment plant at Pandan Mewah for Jaya Ternak S/B
OWNER
:
Bee Hin Developm't
ARCHITECT/CONSULTANT/ ENGINEERS
:
Transwater Sdn Bhd
STARTING DATE
:
May ' 92
COMPLETION DATE
:
Oct ' 92
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Pembinaan Pejabat Pos di Batu 12, Puchong untuk JKR Petaling
OWNER
:
Pos Malaysia Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
JKR
STARTING DATE
:
Sept ' 92
COMPLETION DATE
:
Apr ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Proposed piling & sub-structure works for clean room penicillins factory at Bangi
OWNER
:
Raza Manufacture Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Ismail dan Rakan -rakan
STARTING DATE
:
Nov ' 92
COMPLETION DATE
:
Jan ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Proposed sewage treatment plant at Sungai Buloh
OWNER
:
Sri Damansara
ARCHITECT/CONSULTANT/ ENGINEERS
:
Transwater Eng'g S/B
STARTING DATE
:
Dec ' 92
COMPLETION DATE
:
Apr ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Proposed renovation works for office building
OWNER
:
Isomas Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Jan ' 93
COMPLETION DATE
:
Jan ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Membina satu unit rumah berasingan 2-tingkat di atas Lot 2, Jalan 9/5B, Seksyen 9, Shah Alam
OWNER
:
Mr Ng Say Hoe / Royalton Coating Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Akitek Habitas
STARTING DATE
:
Mar ' 93
COMPLETION DATE
:
Nov ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Factory Extension at 20, Jalan PJS 11/1, Bandar Sunway
OWNER
:
Chocolate Sales & Supplies Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Wong Boon Chong Jurutera Perunding
STARTING DATE
:
Jun ' 93
COMPLETION DATE
:
Aug ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Design & renovation works at Lot 9808 & 9809, Jln Serunai 8, Taman Klang Jaya
OWNER
:
Royalton Coating Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Aug ' 93
COMPLETION DATE
:
Sep ' 93
WORK STATUS
:
Completed
PARTICULARS
:
Proposed roadworks & drainage at Taman SEA, Phase II, Petaling Jaya.
OWNER
:
Sea Park Development Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Macro Resources S/B
STARTING DATE
:
Sep ' 93
COMPLETION DATE
:
Jun ' 94
WORK STATUS
:
Completed
PARTICULARS
:
Design & renovation works for office at 4th floor of Wisma Consplant, Subang Jaya
OWNER
:
Sitt Tatt Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Jul ' 94
COMPLETION DATE
:
Aug ' 94
WORK STATUS
:
Completed
PARTICULARS
:
Design & renovation works for 8 units of condominium at Summer & Spring Villa Condominium, Subang Jaya
OWNER
:
Avenue Properties Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Mar ' 95
COMPLETION DATE
:
May ' 95
WORK STATUS
:
Completed
PARTICULARS
:
Design & renovation works for shoplot at Starhill Centre, Kuala Lumpur
OWNER
:
Dreamworks Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Oct ' 95
COMPLETION DATE
:
Oct ' 95
WORK STATUS
:
Completed
PARTICULARS
:
Design & renovation works for Japanese Restaurant at Lot 6, PJS 45/26, Bandar Sunway
OWNER
:
Guchokipah Japanese Restaurant
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Feb ' 96
COMPLETION DATE
:
Mar ' 96
WORK STATUS
:
Completed
PARTICULARS
:
Design & renovation works for beauty saloon at Lot 121, KL Plaza
OWNER
:
Dibi Beauty Saloon
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Mar ' 96
COMPLETION DATE
:
Mar ' 96
WORK STATUS
:
Completed
PARTICULARS
:
Proposed design & renovation of office at Kelana Parkview, Kelana Jaya
OWNER
:
Wibawa EPC Consortium Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Design Vision Sdn Bhd
STARTING DATE
:
Mar ' 96
COMPLETION DATE
:
Mar ' 96
WORK STATUS
:
Completed
PARTICULARS
:
Proposed design and renovation to double storey house, Taman Bukit Maluri, Kepong
OWNER
:
Wong Quai Weng Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
U-Setia Sdn Bhd
STARTING DATE
:
Nov ' 96
COMPLETION DATE
:
Dec ' 96
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Pembinaan Esprit Melaka City Di Mukim Peringgit, Daerah Melaka Tengah, Melaka ~Hoarding, Temporary road ~Carparks, Drainage works
OWNER
:
Esprit Melaka City Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Esprit Corporation S/B
STARTING DATE
:
Apr ' 97
COMPLETION DATE
:
Jun ' 97
WORK STATUS
:
Completed
PARTICULARS
:
Indah Water Refurbishment programme, Plant No.SED 003 & SED 023, Taman Semarak 11, Jalan Nilai, Pajam Labu, Seremban.
OWNER
:
Talian Ruas Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
IWK
STARTING DATE
:
Mar'98
COMPLETION DATE
:
April'98
WORK STATUS
:
Completed
PARTICULARS
:
Construction and completion of drain covers over "U" shaped monsoon drain & other relevant works at Kota Islam Sultan Alam Shah, Klang, Selangor.
OWNER
:
Talian Ruas Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
JKR
STARTING DATE
:
Aug'98
COMPLETION DATE
:
Oct'98
WORK STATUS
:
Completed
PARTICULARS
:
Lekir Coastal Development, Perak: Phase 1; Sand Reclamation & Slope Protection Works ~ Slope Protection Works
OWNER
:
Desa Kilat Sdn Bhd, Wibawa EPC Consortium Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Terra Geotechnics Sdn Bhd
STARTING DATE
:
Jul'98
COMPLETION DATE
:
Aug ' 99
WORK STATUS
:
Completed
PARTICULARS
:
Construction of Reinforced Concrete Wall For Accomodation Modules at Pulau Jerejak, Penang
OWNER
:
PSC Naval Dockyard Sdn Bhd, Wibawa EPC Consortium Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Ir. Dr. Liew Siew Hock
STARTING DATE
:
Oct'98
COMPLETION DATE
:
Mar'99
WORK STATUS
:
Completed
PARTICULARS
:
Reclamation works at Kota Laksamana (Syit Piawai -13-B-III & IV), KBXLI, Melaka ~ Slope Protection Works
OWNER
:
GEH Construction Sdn Bhd / New Wide Trading Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
LSK Engineering Consultants
STARTING DATE
:
Apr ' 99
COMPLETION DATE
:
Jun '00
WORK STATUS
:
Completed
PARTICULARS
:
Construction & Completion of 46 Units Semi-Detached Houses (SD-25 To SD-62, SD-17 To SD-24) And 44 Units 2-Storey Low Cost TownHouses (Block 3 & 4) On Lot 806 & 807, Mukim Rembia, Daerah Alor Gajah, Melaka For M/S Teobros Development Sdn Bhd - Construction & Completion Of Rubble Retaining Wall.
OWNER
:
Fonion Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
LSK Engineering Consultants
STARTING DATE
:
April' 00
COMPLETION DATE
:
Feb' 01
WORK STATUS
:
Completed
PARTICULARS
:
Upgrading Works at No. 101, Lot 3224, Mukim Batu Berendam, Lapangan Terbang Batu Berendam, Melaka ~Phase 1
OWNER
:
Malaysian Flying Academy Sdn Bhd (Subsidiary Of Kumpulan Syed Kechik Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
-
STARTING DATE
:
Oct' 00
COMPLETION DATE
:
Nov' 00
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Kerja-Kerja Untuk Penambakan Untuk Kawasan Seluas 7 Ekar, Pekan Klebang, Seksyen 1, Daerah Melaka Tengah [Syit Piawai 33-C-IV], Melaka.
OWNER
:
SM Marine Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
LSK Enginering Consultants
STARTING DATE
:
April' 01
COMPLETION DATE
:
Jul' 01
WORK STATUS
:
Completed
PARTICULARS
:
Repair Seawall and related Works for Klebang Beach Resort at 92-1, KM9, Batang Tiga, Tanjung Kling, Melaka
OWNER
:
Parklim Development Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
LSK Engineering Consultants
STARTING DATE
:
29 Oct ' 01
COMPLETION DATE
:
29 Nov ' 01
WORK STATUS
:
Completed
PARTICULARS
:
Proposed Reclamation And Shore Protection at Jalan Lingkaran Luar Butterworth-Package 3 Chainage 6800 to 10750 under authority of Lembaga Lebuhraya Malaysia.
OWNER
:
Lingkaran Luar Butterworth (Penang) Sdn Bhd / SPUB / Isyoda (M) Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Engineering and Enviromental Consultants Sdn Bhd
STARTING DATE
:
4th March 2002
COMPLETION DATE
:
3th March 2003
WORK STATUS
:
Completed
PARTICULARS
:
Proposed Reclamation and Shore Protection and Ancillary Works For Golden Hank SB, Tatmax Corporation SB & Bumi Tabah SB, Plot 1,2 & 3 [Syit Piawai 43-B-11, 11/6 & 11/6C] at Klebang Besar, Melaka
OWNER
:
Limbongan Development Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
LSK Engineering Consultants
STARTING DATE
:
May'03
COMPLETION DATE
:
Aug'03
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Project Pembangunan Peranginan Water Chalet, Service Suite,Tempat Letak Kereta Serta Kemudahan Lain Di Lot PT 302, Pekan Port Dickson, Daerah Port Dickson, Negeri Sembilan Darul Khusus. ~Reclamation and Shore Protection Works
OWNER
:
Kuala Lumpur Metropolitan (M) Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Seth Architect / Jurutera Perunding Cekap
STARTING DATE
:
Dec '03
COMPLETION DATE
:
May '04
WORK STATUS
:
Completed
PARTICULARS
:
Reclamation and shore protection works for Kerja-kerja Membaiki Pulih Pantai Di Pulau Perhentian, Trengganu
OWNER
:
JKR
ARCHITECT/CONSULTANT/ ENGINEERS
:
JKR / Kongsi Murni (M) Sdn Bhd
STARTING DATE
:
Nov-04
COMPLETION DATE
:
Mar-05
WORK STATUS
:
Completed
PARTICULARS
:
Reclamation and shore protection works for Project Pangkalan Polis Marin di Pelabuhan Klang, Selangor - Fasa 1
OWNER
:
JKR
ARCHITECT/CONSULTANT/ ENGINEERS
:
JKR / Pulau Reka Kembang Maju JV / Kongsi Murni (M) Sdn Bhd
STARTING DATE
:
Aug-05
COMPLETION DATE
:
Mar-06
WORK STATUS
:
Completed
PARTICULARS
:
Extension of Double Storey Semi D at No,4, Jalan Bukit Merah 1, Bukit Antarabangsa, Ampang, Selangor
OWNER
:
Dato' Tajudin Bin A. Wahab
ARCHITECT/CONSULTANT/ ENGINEERS
:
Pulau Reka Kembang Maju JV
STARTING DATE
:
Mar-06
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan timbugan Kerja Tanah bagi Permohonan Kelulusan Konsep Pembangunan bagi Tanah Tebusguna Jelutong Waterfront untuk Jelutong Development Sdn.Bhd.
OWNER
:
Jelutong Development Sdn.Bhd.
ARCHITECT/CONSULTANT/ ENGINEERS
:
JMR Construction Sdn.Bhd.
STARTING DATE
:
February 2007.
COMPLETION DATE
:
February 2009.
WORK STATUS
:
Completed
PARTICULARS
:
Contract Works for Reclamation Works for Parcel A1, A2 & B1 Jelutong Waterfront Project-Rental of machinery, supply of diesel and fresh Water.
OWNER
:
Jelutong Development Sdn.Bhd.
ARCHITECT/CONSULTANT/ ENGINEERS
:
Nanjing Changjiang Waterway Engineering Bureau
STARTING DATE
:
February 2007.
COMPLETION DATE
:
February 2009.
WORK STATUS
:
Completed
PARTICULARS
:
Construction and completion of CT5 Wharf and Access Bridges Westport Pulau Indah, Port Klang, Selangor Darul Ehsan ~ Slope Protection Works
OWNER
:
Westport Malaysia
ARCHITECT/CONSULTANT/ ENGINEERS
:
HSS Intergrated Sdn Bhd / Putra Perdana Construction Sdn Bhd
STARTING DATE
:
Oct 2008
WORK STATUS
:
Completed
PARTICULARS
:
Cadangan Pembangunan Infrastruktur Bagi Keperluan Projek Tanjong Agas Supply Base & Marine Services, Taman Industri Minyak & Gas Dan Maritime Di Tanjong Agas, Pekan, Pahang Darul Makmur. Pakej 1 & 2 (PVD installation Works)
OWNER/ CLIENT
:
Putra Perdana Construction Sdn Bhd
ARCHITECT/CONSULTANT/ ENGINEERS
:
Jurutera Perunding Meinhardt Sdn Bhd
STARTING DATE
:
Oct 2009
WORK STATUS
:
Completed
PARTICULARS
:
Construction And Completion of Fist 300M of CT6 Wharf (B17) and Access Bridge at Westports, Pulau Indah, Port Klang, Selangor Darul Ehsan
OWNER
:
Westport Malaysia
ARCHITECT/CONSULTANT/ ENGINEERS
:
HSS Intergrated Sdn Bhd / Putra Perdana Construction Sdn Bhd
STARTING DATE
:
Nov 2010
WORK STATUS
:
Completed